Community Planning &
Economic Development

Construction Code Services
Public Service Center
250 S. 4th St., Suite 300
Minneapolis, MN 55415
311 or (612) 673-3000

Visit Business Portal button

Didn't find what you are looking for?  Visit the Contact 311 web page for information about the City and City services.

 

Plan Review

Important Change to the Minnesota Building Code:

Plan Review Letter

A revised section to the administrative rules portion of the state building code will change how some of our plan reviews for some remodeling, mostly commercial/multi-family, will be done. When plans are prepared by a licensed design professional the new language will require that any code corrections that are identified be itemized by the code official through a plan review letter. The provision prevents the building department from marking up (red-lining) plans. This change takes effect January 24, 2015.

1300.0130 Construction Documents.

              Subpart 6. Approval of construction documents.

              Subitem B. (in part) "Any code deficiencies identified by the building official during the plan review process for construction documents that are prepared by a design professional who is licensed or certified under Minnesota Statutes, sections 326.02 to 326.15 must be itemized by the building official through a comprehensive plan review letter only. Any code deficiencies identified by the building official during the plan review process for construction documents that are not prepared by a licensed or certified design professional may be marked directly on the document or itemized by the building official through a comprehensive plan review letter."

This means that there will be a couple of extra steps in the process for some projects. Rather than plan review marking corrections of code deficiencies on plans and issuing a permit at that time, plan review will prepare and mail or email a correction letter to the architect/engineer. The design professional will then make any necessary revisions to the plans. Revised plans will then need to be resubmitted for review, approval and permit.

Please plan accordingly for the time necessary for these added steps.

New Construction Requirements

In an effort to better control problems related to the protection of adjoining property that have arisen due to inadequate construction management, the following information is presented and will be required for all new building projects that require excavation.

Additions to buildings that are ten feet (10') or less from structures on adjoining property shall also be required to submit a letter from an engineer.

Construction sites have also become a problem with respect to the use of city right-of-way.  Current city standards do not allow the use of right-of-way for staging or storing of construction materials or for other related uses. The right-of-way normally extends several feet into any property from the sidewalk.  All construction sites shall:

Construction debris containers that must be placed in the street require obtaining a street use permit. These containers must comply with any parking regulations in place either temporary or permanent. Containers located in the street should always be placed in front of the property where work is occurring. Containers may be placed within the property being worked on, but not in the right-of-way, without a permit.

Violations of these requirements will result in the issuance of appropriate orders and citations which will remain in place until compliance is achieved.

Minneapolis Residential Construction Management Agreement

As a result of the problems that have been occurring the city's Zoning and Planning Committee voted Thursday, April 3rd to lift the tear down moratorium and replace it with the Construction Management Plan. Effective April 3rd, 2014 all un-occupied construction projects of wrecking, new build, or major remodeling of 1 and 2 unit dwelling structures are subject to sign the Residential Construction Management Agreement.

New Mechanical Requirements

Mechanical Contractors: The City of Minneapolis requires that the heating load form for furnaces and boilers installed in single family homes or duplexes be left at the job site

Last updated Dec 26, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Minneapolis 14 Government TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo