Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

Alleys:
Alley Renovation
Alley, S of 45th Ave N, James-Irving
Bike/Ped Trails:
Bluff St Bicycle/Ped Trail
Bridges:

10th Ave SE Bridge Rehabilitation
Bridge 9 Rehabilitation
St Anthony Parkway Bridge
Miscellaneous:
ADA Ramp Reconstruction
I-94 Exit Ramp to 7th Street
Seal Coat Projects 
Traffic Signal Retiming
Parkway Resurfacing:
Cedar Lake Parkway
E Minnhaha Parkway
Theodore Wirth Parkway
Sewer/Storm Drain:
CSO 007
Sewer Pipe Lining
Smoke Testing
Sidewalk Repair & Reconstruction:
Cedar Ave Sidewalk
Sidewalk Repair
Street Reconstruction:

4th St S Ramp & Auxiliary Ramp
8th St SE Paving
15th Ave S & 4th St S Reconstruction
28th Ave S Renovation
Emerson Ave S Reconstruction
Hennepin/Lyndale Reconstruction
LaSalle Ave Paving
Penn Ave S Reconstruction
Street Resurfacing (High Volume):

4th Ave S Resurfacing
51st Ave N Resurfacing 
58th St E, Mn-62 Frontage Road Resurfacing
E Lyndale Ave N Frontage Rd Resurfacing
Loring Park, North Loop High Volume Resurfacing
Pleasant St SE Resurfacing
Street Resurfacing (Residential):
4th St N (49-51) Resurfacing
5th Ave N, 5th St N, 8th Ave N Resurfacing
40th St E-W Resurfacing
Burroughs North/Dupont Ave S Resurfacing
Edgewater/Cedar Ave Resurfacing 

Hay Northwest Resurfacing 
Lowry Hill East Resurfacing 
Lyn Park Resurfacing 

2014 map

40th Street E-W Residential Resurfacing Emerson Ave S Reconstruction 4th Avenue South High Volume Resurfacing 51st Ave N High Volume Resurfacing E Lyndlae Ave N Frontage Rd Resurfacing 58th St E & MN-62 Frontage Road High Volume Resurfacing 5th Ave N, 5th St N & 8th Ave N Residential Resurfacing Burroughs North and Dupont Ave S Residential Resurfacing Edgewater/Cedar Residential Resurfacing I-94 Exit Ramp to 7th Street Hay Northwest Residential Resurfacing 4th St S Ramp & Auxiliary Lane CSO 007 Loring Park/North Loop High Volume Resurfacing Lowry Hill East Residential Resurfacing Smoke Testing Smoke Testing Traffic Signal Retiming Lyn Park Residential Resurfacing 4th St S Ramp & Auxiliary Lane 4th St S Ramp & Auxiliary Lane 4th St S Ramp & Auxiliary Lane Penn Ave S Paving 4th St N (51-49 Resurfacing LaSalle Ave Paving 10th Ave SE Bridge Rehabilitation 28th Ave S Renovation Cedar Ave Sidewalk Reconstruction Pleasant St SE Resurfacing 15th Ave S & 4th St S Reconstruction St Anthony Pkwy Bridge& California St Pleasant St SE Resurfacing Bluff St Bicycle/Ped Trail Bridge 9 Renovation Hennepin/Lyndale Reconstruction Sewer Pipe Lining Sealcoat Projects ADA Ramp Reconstruction 8th St SE Paving Sidewalk Repair Sidewalk Repair Sidewalk Repair Sidewalk Repair Sidewalk Repair Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Unpaved Alley Theodore Wirth Parkway Resurfacing Cedar Lake Parkway Resurfacing E Minnehaha Parkway Resurfacing E Minnehaha Parkway Resurfacing Image Map

Last updated Jul 11, 2014