Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

cso area 007 location map

CSO Area 007 &
Flood Area 64

 

Project Type:

This is a flood control and combined sewer overflow (CSO) removal project.  The goal is to help protect the homes in the area of the 2900 block of Upton Ave N from damage caused by localized street flooding for a “100-year” rain storm event.  It also allows combined sewer overflow to be disconnected from the sanitary sewer on the 2900 block of Sheridan Ave N.

 

Project Limits: The area between 29th and 30th Aves N from Upton Ave N to Logan Ave N.

 

Construction Start Date: Project moved to 2014.

 

Length of Construction: To be determined

 

Traffic Impact: To be determined

 

Contact: Seifedin Burka  612-673-2414

 

Project Updates:

June 26, 2013:
This project has been moved to 2014.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.)  Citizens concerned with pedestrian access during construction should contact the project manager directly.

 

Last updated May 20, 2014