Sidewalk Repair

Project Type:
Sidewalk repair is done block by block, depending on the amount of work to be done on each block.  Usually there will not be work on any single block for more than two days.  Work will move down a street in an area until complete, and then move on until all the work is completed in each area, as shown on the map. 

Project Limits:
As shown on detailed map.

Construction Start Date:
The 2014 construction season will not start before June and should be complete by the end of September.

Duration of Construction:
As needed for each block.

Traffic Impact:
Temporary, no parking in work areas; no individual city blocks will be impacted for more than two days at a time, on average.

Contacts: Sidewalk Inspections 612-673-2420

Project Updates:
Look for updates here.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Feb 12, 2014