This is a paving resurfacing project. Resurfacing projects use a mill and overlay process. This process will consist of removing a portion of the existing asphalt pavement surface and placing a new surface over the entire street. The purpose of the resurfacing program is to extend the life of a roadway by approximately 10 years. Without this program, streets in the in the program would not see surface improvements for many years.
This project was originally paved in 1965 and sealcoated in 2003.
Approximately 2800 feet of East Lyndale Ave will be resurfaced between the 49th and 53rd entrance and exit ramps on I-94.

Project Limits:
The East Lyndale Ave North frontage road project is located in north Minneapolis on East Lyndale Ave N from 49th Ave N to 53rd Ave N.

Construction Start Date: 
Project is canceled.

Duration of Construction:
It will last about one week.

Traffic Impact:
The work will be performed during full or partial road closures. Please note that street parking will be impacted and short term intermittent access restrictions may occur. When construction work will be done on a particular street in the project area, the street will be posted NO PARKING prior to work on that particular street.
There will be some day time road closures.

Contacts: Chris Trembath 612-919-1196

Project Updates:
September 17, 2014: Project is canceled.
June 23, 2014:  Project is postponed.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Sep 18, 2014