Public Works Logo

Public Works
350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

To contact, call 311.

Hennepin/First Avenue Transportation Study

The City of Minneapolis is leading a multimodal transportation study to evaluate the existing transportation system and a range of roadway alternatives in the Nicollet Island-East Bank and Marcy Holmes neighborhoods. This study will focus on the Hennepin and First Avenue corridors between Main Street Southeast and 7th Street Southeast, while also evaluating interconnecting streets within the study area.

Note: Currently there are no planned or programmed improvements along the Hennepin and First Avenue corridors.

Study Details

Why is this study being done?

This planning study will examine one-way, two-way, and hybrid roadway configurations along the Hennepin and First Avenue corridors with consideration for quality of life, access, safety, connectivity, and mobility for all modes of travel. The study will be coordinated amongst City, County, MnDOT, and Metro Transit staff to identify draft roadway concepts and document impacts (i.e., pros and cons) associated with any potential implementation.

There will be particular attention to the following elements:
 · access to and from primary destination points,
 · innovative pedestrian and bicycle infrastructure,
 · providing a safe environment for all travel modes, 
 · alignment with future development plans,
 · changes in traffic operations and parking demand,
 · existing and planned transit service, and
 · consideration of travel through the study area.

Key Study Tasks:
 · Data Collection
 · Existing Conditions Inventory and Analysis
 · Alternatives Analysis
 · Traffic Operations Analysis
 · Concept Development and Evaluation
 · Documentation and Final Report

Study Duration:
This study will be conducted over the course of twelve months, between May 2015 and April 2016.

Documentation:

Existing Conditions Summary
Final Report

Meeting Materials:

Meeting #1 Presentation
Meeting #1 Minutes

Meeting #2 Presentation
Meeting #2 Evaluation Process
Meeting #2 Minutes

Meeting #3 Presentation
Meeting #3 Minutes
Meeting #3 Concept Detailed Analysis

 
Contact 

Nathan Koster, 612-673-3638 or [email protected].

 

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

 

Last updated Jun 15, 2018

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

Minneapolis 311       ©1997-2019 City of Minneapolis, MN

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Watch Minneapolis City Council TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo