The Safe Routes to School (SRTS) Program improves the City's streets with pedestrian and bicycle improvements for students and children. The SRTS Program's resources and projects are allocated in an equitable manner.  To encourage students to walk or bicycle to/from school, the SRTS program seeks to improve the comfort and safety of the City's pedestrian and bicycle network near schools, parks, libraries, and other neighborhood destinations.

Contact

For general info about the SRTS program, contact Virginie Nadimi, Associate Transportation Planner at  612-673-5011, [email protected]  To report specific comments about traffic operations near schools, please contact City of Minneapolis 311.  

2019 Improvement Locations

Roosevelt High School Improvements: Public Works is currently collecting data and working with Roosevelt staff, students, and the community to identify potential SRTS treatments to be installed in 2019.

2018 Improvement Locations

29th Avenue South Traffic Diverter at Midtown Greenway

Project Type
Traffic Calming/Diversion

Project Limits
29th Ave S at Midtown Greenway crossing

Start Date
Summer 2018

Contact Information
Forrest Hardy, 612-221-8255 or [email protected]

Project Details

In summer 2015, Public Works implemented a test closure of 29th Ave S at the Midtown Greenway to reduce the volume of automobile traffic adjacent to Seward Montessori School as part of a Safe Routes to School planning effort. The test found that the closure was effective at diverting vehicle traffic off of 29th Ave S, which is classified as a local street and is a designated bicycle boulevard. The test received much support from the Seward and Longfellow neighborhoods, and aided the bike/walk programming efforts at Seward Montessori school. The City was awarded federal funds to implement the 29th Ave S bicycle boulevard, which was constructed between Franklin Ave and Lake Street in summer of 2017. A recommended concept for traffic diversion at 29th Ave S at the Midtown Greenway was presented to City Council in January of 2017. Public Works has completed a final design for this traffic diverter and it is scheduled for construction after the Spring 2018 school semester.

Updates

 July 2018: Construction is underway and is expected to be completed by the end of the month.

April 2017: A final construction plan has been developed for the traffic diverter at 29th Ave S and the Midtown Greenway. This diverter is expected to be constructed in spring or summer 2018.

October 2017: Public Works staff are currently identifying funding sources for the project and are further developing the engineering design of the closure medians.

February 2017: At the January 31st City Council Transportation and Public Works Committee meeting Public Works staff presented permanent treatment concepts for 29th Ave S at the Midtown Greenway. The staff recommendation was a full closure to vehicular traffic along 29th Ave S at the Midtown Greenway. This treatment concept involves a constructed, raised barrier  that allows for emergency vehicles to maneuver through the closure if necessary. A space for bicyclists to pass through the barrier would allow continued access for those users. The concept also proposes signage changes along 30th Ave S to mitigate the increased volume of traffic recorded at that Greenway crossing. This includes new stop signage at the intersection of 30th Ave S and 27th St E, just north of the Greenway. Funding has not yet been identified for these improvements, and a timeline for implementation has not been set.

More information can be found on the City Council webpage at this link.

May 2016: Federal funding was recently awarded for bicycle boulevard improvements along 29th Ave S and 24th St E. See project page for more details. Discussion surrounding the Greenway crossing at 29th Ave S will be incorporated into community engagement regarding the bicycle boulevards. This community engagement will be begin May 2016.

Fall 2015: The closure was kept in place this fall in order to conduct vehicle counts while school is in session. Those counts are now complete. Continued outreach with neighborhood residents and businesses is expected later this fall, as many residents are requesting that the closure remain in place.

Feedback has been mostly supportive, with 72% positive comments vs. 25% negative comments and 3% neutral out of 331 total comments received. Traffic reduction adjacent to the school was 13%, lower than expected. However, many residents reported a perception of safer conditions and decreased traffic due to the closure.

The primary benefit of the closure was observed for Greenway users. An estimated 2,740 people use the Greenway at 29th Ave S daily, based on peak hour counts. This number includes bicyclists and pedestrians. This compares to 972 vehicles using 29th Ave S just north of the Greenway before the closure was put in place. Eliminating conflicts along the Greenway was one of the intended benefits of the test closure. The test eliminated one of the five surface crossings trail users must navigate on this portion of the Greenway.

Many of the negative comments received centered around access between Franklin and Riverside Avenues and Lake Street. Portions of 31st Ave S and 30th Ave S received higher levels of vehicle traffic after the closure was in place. There were safety concerns at the Greenway and 30th Ave S, due to the additional traffic along 30th Ave S and its sharp hill crest at the Greenway. There was an increase in traffic of 30% (a net gain of 132 vehicles per day) on 30th Ave S just north of the Greenway. Another concern was delivery access to businesses just south of the Greenway.

29th-Diverter-Const

Construction of diverter islands underway 7/10/18

Southwest High School Safe Routes Improvements

Project Type
Safe Routes to School: Pedestrian crossing improvements

Project Limits
47th Street West and Xerxes Avenue South

Project Planning and Development
2017-2018

Anticipated Construction Start Date
July 2018

Contact Information
Becca Hughes, 612-673-3594 or [email protected]

Project Details

The scope of the project includes the intersection located at 47th Street West and Xerxes Avenue South. This intersection was evaluated in 2014 as part of Metropolitan Council’s regional solicitation process and an application was submitted for federal funding, but funding was not awarded. Public Works has built upon the preliminary design developed in 2014, and expanded it to include additional elements. 

These elements include:

  • Curb extensions, with new ADA pedestrian ramps, extending into Xerxes Avenue South at all four corners of the intersection;
  • A push-activated overhead pedestrian flasher with four (4) Rectangular Rapid Flashing Beacons (RRFB) – signage and flashing beacons;
  • New pavement markings including “zebra” crosswalks and a stop bar.

The proposed project is scheduled to occur over the course of the 2018 construction season. Public Works is currently in the preliminary stages of planning and design for the project, which will be accompanied by community outreach activities that will help inform and guide design concepts.

Project Layout

Preliminary Layout

 

Last updated Aug 7, 2018

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

Salary Compliance Notice:
State statute 471.701; Notice of Salary Compliance, requires that the City post for not less than 90 days
the job title of the three highest paid employees along with their base salary. For 2018 these were:
1. City Attorney, $186,490
2. Assistant City Coordinator Convention Center, $183,600
3. Director Public Works, $181,191

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Watch Minneapolis City Council TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo