Community Planning & Economic Development > Current Projects

Background
Shoreham Yards, owned by Canadian Pacific Railway, is a 230-acre train, trucking and bulk-distribution site extending from Central to University avenues NE and 27th Avenue NE up to St. Anthony Parkway in Northeast Minneapolis.
It is also a designated Industrial Business Park Opportunity Area as well as a Potential Growth Center for employment growth in the City’s Comprehensive Plan. These designations mean that the City will support redevelopment of this area for new light industrial businesses that provide high job density, good wages and low impact on the surrounding community.
The site is one of several target areas in the City of Minneapolis’ Brownfields Program.
The property is home to the city-designated historic Shoreham Roundhouse (1887).
Cleanup Efforts
The Railroad and several former lessees of the property have initiated a Voluntary Investigation and Cleanup Program covering approximately 20-plus acres in the southeast corner of the yards along Central Avenue. As part of their activities they have prepared, for approval by the Minnesota Pollution Control Agency, an area-wide Response Action Plan (RAP) for the East Side Shoreham Facility. This plan identifies the cleanup levels and techniques that are proposed. The links will take you to the text and figures in the proposed area-wide RAP. Early in 2006 there will be a public meeting to seek input on the area-wide RAP. For additional information, please contact Jim Forsyth.
East Side Response Actions Plan (RAP)
Shoreham East Side Rap Text - (PDF, 67 pages, 317 KB)
Figure 1-1 – Facility Location Map (PDF, 299 KB)
Figure 1-2 – Facility Base Map (PDF, 446 KB)
Figure 3-1 – Local Shallow Groundwater Flow (PDF, 519 KB)
Figure 3-2 – Cross Section Groundwater Flow (PDF, 162 KB)
Figure 3-3 – Local Groundwater Flow (PDF, 169 KB)
Figure 3-4 – Map of Wells (PDF, 379 KB)
Figure 4-1 – Degradation of Chlorinated Compounds (PDF, 292 KB)
Figure 4-2 – 1,1,1-TCA Degradation Pathways (PDF, 359 KB)
Figure 4-3 – PCE/TCE Degradation Pathways (PDF, 373 KB)
Figure 4-4 – Till Groundwater: Proposed Phase I Sampling Network (PDF, 500 KB)
Figure 4-5 – Till Groundwater: Initial Screening Process Flow Chart (PDF, 194 KB)
Figure 4-6 – Proposed Alluvium SVE Well Locations (PDF, 284 KB)
Figure 4-7 – Proposed Till SVE Well Locations (PDF, 281 KB)
Figure 4-8 – Area of Concern in Former Diesel Shops Area (PDF, 317 KB)
Figure 4-9 – Monitoring Well and Hydroprofile Locations (PDF, 214 KB)
Figure 4-10 – Monitoring Well and Hydroprofile Screened Interval Elevations (PDF, 325 KB)
Figure 4-11 – Total CVOC Groundwater Concentrations (PDF, 311 KB)
Figure 4-12 – OPD Monitoring Wells (PDF, 142 KB)
Figure 4-13 – Groundwater Concentrations in OPD Wells (PDF, 169 KB)
Figure 4-14 – Groundwater Concentration in OPD with Distance from MW02-01-OPD (PDF, 111 KB)
Figure 4-15 – Natural Attenuation Parameters in OPD Wells (PDF, 326 KB)
Soil Vapor Extraction Design Report
Former Waste Reclamation/Round House/Shops Areas
Shoreham Design Report Text (PDF, 28 pages, 99 KB)
Table – Summary of Estimated VOC Concentrations (PDF, 1 page, 10 KB)
Figure 1 – Facility Location Map (PDF, 228 KB)
Figure 2 – SVE Well Layout (PDF, 159 KB)
Figure 3 – SVE System Piping Layout (PDF, 198 KB)
Figure 4 – SVE Well / Monitoring Probe Details (PDF, 248 KB)
Figure 5 – Equipment Layout (PDF, 159 KB)
Figure 6 – Process and Instrumentation Diagram: Shops Area (PDF, 110 KB)
Figure 7 – Process and Instrumentation Diagram: Round House Area (PDF, 184 KB)
Figure 8 – Process and Instrumentation Diagram: Former Waste Reclamation Area (PDF, 163 KB)
Figure 9 – Proposed Additional Soil Investigation: Former Diesel Shops Area (PDF, 1,091 KB)
Appendix A – Equipment Specifications (PDF, 172 KB)
Additional Materials
Please note: several of the following PDF files are large and could take several minutes to download. We are in the process of trying to provide this material in smaller files.
IRAP Design Report
Appendix A (PDF, 609 KB, 33 pages)
Appendix B (PDF, 220 KB, 16 pages)
Appendix C (PDF, 4.9 MB, 26 pages)
Figures (PDF, 1.1 MB, 10 pages)
Final Text (PDF, 278 KB, 25 pages)
IRAP Report
Volume I (PDF, 4.2 MB, 41 pages)
Volume II (PDF, 26.3 MB, 446 pages)
Responses to MPCA Modifications
Ashlund (PDF, 711 KB, 11 pages)
SYard Future Use (PDF, 527 KB, 1 page)
Site Conceptual Model Report
SCM-NOV04_1 (PDF, 25.9 MB, 25 pages)
SCM-NOV04_2 (PDF, 22.7 MB, 24 pages)
Soil Vapor Extraction Fourteen Day Startup Test Report
Transmittal Letter (PDF, 39 KB, 1 page)
Test Report (PDF, 1 MB, 238 pages)
Appendix C (PDF, 809 KB, 68 pages)
Detailed Corrective Action Design for MPCA Leaksite 1571 – October 2006
View report (PDF, 15 MB, 110 pages)
last updated May 1, 2008