Minneapolis Elevator Permit
Fee Schedule
Effective April 4, 2005
TYPE OF WORK
|
FEE
|
Minimum Fee - Residential or Commercial
|
$60.00 (Includes $0.50 State Surcharge)
|
New Equipment (Single Elevator)
|
1.55% of Job Value
|
Alterations, Repairs, or Replacement *
|
1.55% of Job Value
|
Temporary Construction Use
|
$82.50
|
*A separate form is required for each elevator.
Add State Surcharge to all permits (except minimum fee as shown).
State Surcharge is 0.0005 x the job value with a minimum of $0.50. Version 4/2005
|