Andersen School Safe Routes Improvements

Andersen School is the city's largest K-8 school with 1194 students. This student population is larger than 4 of the city's 7 MPS high schools. Andersen is bordered to the north and south by 26th & 28th Streets, which are high-volume, multi-lane streets. It also shares a site with Stewart Park.

In 2014 Public Works applied for and was awarded federal TAP dollars to improve pedestrian crossings near the school and to build an enhanced bicycle connection between the Midtown Greenway and the school site. These improvements will serve the school, park, and surrounding Phillips community, as well as employees and visitors to the adjacent hospital campus.

Project Details

Project Type

Federally funded Safe Routes infrastructure: bicycle facility; pedestrian crossing improvements

Project Limits

Pedestrian Improvements on 26th St E between 10th Ave S and 12th Ave S; A bicycle facility connecting the Midtown Greenway Trailhead with Andersen School / Stewart Park

Project Planning and Development

2015-2016

Construction Start Date

August 2017

Project Layout

The connection between the Midtown Greenway and Andersen School / Stewart Park is outlined in the City's Bicycle Master Plan as the 11th Ave Trail and the 10th Ave Bikeway. Meetings will be held in 2016 to gather feedback on the proposed bikeway and pedestrian improvements.

Project Updates

July 9, 2018: Construction is anticipated to be completed in July of 2018.

April 24, 2018: The pedestrian improvements along 26th St E and 28th St E were constructed in summer 2017. The bikeway trail connection on 28th St E will be constructed summer 2018, to provide better two-way bike access between the school and Midtown Greenway. The travel lanes of 28th St E  will be impacted during construction of the trail, though there will be no long-term impact to the travel lanes upon trail completion. The trail will replace the existing on-street bikeway and buffer for one block. The local streets 11th Ave S and 12th Ave S will be marked with bike boulevard symbols as part of this new bikeway connection.

Preliminary project layout
Walking Routes for Youth serving Andersen School

Site Photos

Trail connection along 28th St E under construction, June 2018
28thStE-AndersenTrail-4-rdc

 

Contact Information

Forrest Hardy, Transportation Planner, 612-221-8255 or [email protected]

Adam Hayow, Construction Engineer, 612-673-2172 or [email protected]

 

Last updated Jul 10, 2018

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Minneapolis 14 Government TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo