Commercial stormwater credit application

Complete this form to apply for a credit.

Before you begin

Be sure you have the required application materials:
  • Basic Salt Management Plan (SMP)
  • Maps, plans, and diagrams detailing:
    •   The drainage for the entire site including:
      • Drainage area delineations to each stormwater management facility.
      • Impervious area for each delineation and facility.
    • All related infrastructure to the stormwater management facilities, including pre-treatment, inlets, outlets, storm pipes, manholes and underdrains
    • Any connection points to the City of Minneapolis stormwater system
  • Provide modeling information or calculations to prove that credit criteria are met as follows:
    • Water Quality Credit: Provide water quality model inputs and results using one of these models
      • P8 (version 2.4 or newer)
      • WinSLAMM (version 9.4 or newer)
      • MIDS Calculator
    • Rate control credits:
      • HydroCAD
      • XP SWMM
      • EPA SWMM
    • Volume control credit:
      • Calculation in conjunction with HydroCAD
  • Operations & Maintenance (O&M) Plan: Include pollution prevention practices for the properties, such as covering material storage areas.
  • Advanced SMP (if applying for Advanced SMP Credit Type): This is separate from the Basic SMP and must demonstrate that winter maintenance practices are reducing and/or eliminating salt use in applicable areas.

Get templates and examples of supporting materials

Applicant guide

Types of stormwater credits

 

Credit Type

Description

% of Stormwater Charge

Applied to

1

Chapter 54

Meet the minimum standards for water quality treatment, peak discharge rate control, and volume control of Chapter 54 as a part of development approval.

10%

Property area meeting the standard.

2

Advanced Salt Management Plan (SMP)

Implement a SMP that demonstrates winter management salt reduction: Advanced SMP Form Here

   Up to 30%

Portions of property where winter site management is required.

3

Voluntary/Unregulated

  • Voluntary BMPs (not required as a part of development) meeting water quality treatment, peak discharge rate control, and volume control standards as outlined in Chapter 54.
  • Water quality treatment: remove at least 75% of the total phosphorus (TP) on an average annual basis.

 Up to 30%

Property area meeting the standard.

4

Above and Beyond

  • Volume reduction: Capture and retain on-site 2.0” of runoff from impervious surfaces
  • Peak discharge rate control: Maintain peak discharge rates at or below the pre-settlement rates for the 10-, and 100-year storm events

       20%

 

       60%

Property area meeting the standard.

5

Equity

Credit added for implementing stormwater best management practices on properties located in Green Zones

       10%

Property area meeting the standard.

 

Request accessible format

If you need help with this information, please email 311, or call 311 or 612-673-3000.

Please tell us what format you need. It will help us if you say what assistive technology you use.

2023 Commercial Stormwater Credit Application-Open

Contact us

SWS Credits

Surface Water and Sewers
Public Works Department