Recertify your commercial stormwater credits
Credit recertification tiers
Each site will be assigned a credit recertification tier. The tier is based on the site's annual credit amount.
You will receive a letter telling you which tier you are in.
Recertification documents you need to submit
For all applicants
You must submit the following documents to complete the recertification process:
An application with complete site details:
- Address
- Owner
- Contact information
A map showing the site conditions, including:
- The total impervious area.
- The size and location of stormwater facilities.
- The flow path from the impervious areas to the stormwater facilities.
Operations and Maintenance (O&M) Plan:
- A plan that shows how your stormwater system is maintained.
- View a sample O&M Plan
Documentation of Best Management Practices (BMPs)
- These can be photos or videos.
Annual inspection and maintenance records
- The records must show that inspections were done at least annually, or more often if the O&M Plan requires it.
Basic Salt Management Plan
To complete a Basic Salt Management Plan, you'll need to:
- Take the Minneapolis Salt Mini-Course
- Earn the Minnesota Pollution Control Agency (MPCA) Smart Salting certification
Both of these trainings must be documented on the Basic Salt Management Plan.
View the Basic Salt Management Plan
Applicants must also submit the following documents for their assigned credit tier.
Some documents may need to be completed or signed by a licensed or certified professional.
Tier 1 applicants
The City will provide you with a checklist or simple form. This is for assessing small sites or BMPs.
Tier 2 applicants
You must provide:
A map detailing the drainage for the entire site, including:
- All infrastructure relating to stormwater BMPs. Examples include:
- Inlets
- Outlets
- Storm pipes
- Maintenance holes
- Underdrains
- Any connection points to the City of Minneapolis stormwater system or discharge offsite.
- Functional assessment of the BMPs.
- This must show that the BMPs are functioning as designed.
- Documents must be signed by a certified professional.
Tier 3 applicants
You must provide:
- Everything listed in Tier 2.
- A licensed professional must verify the hydraulic and hydrologic modeling.
- If previous modeling exists, you may submit it. A certified professional must verify that the site conditions have not changed.
Tier 4 applicants
You must provide:
- Everything listed in Tier 2 and Tier 3.
- A certification from a licensed professional that the stormwater facilities:
- Have been constructed.
- Continue to meet the standards of the stormwater credits program.